Waterproofer did first layer on 2 showers, under floor heating layed but did not do the 3rd shower, so need 3rd shower 1st layer done for under floor heating, floor already levelled. Then the 2nd layer on all 3 showers 1 x 1 mtr. Tiling to be done as well floor and walls 90 sqm. Waterproofing cost $1,000 to finish and tiling additional $4,600 Call 021 0223 6644
Partner with Builderscrack
Get work