I would like to meet on site this week, to look at creating --- x? trenches required for the inground stormwater management, post 2023 storms/cyclone. Only contractors with access to a small digger might be best suited to the scale of the work. . Photos/files are attached of what we're looking for: 1. Drilling one Dia. 500mm hole at a depth of 1m for the final pile, dropping the 270 Dia pile, plus concrete at the corner of the garage Pt-A. 2. Creating 3 trenches for stormwater from: a) SW-3 @ 3.5m, to beam, b) SW-2 @ 6.0m, to beam, c) One parallel to the new concrete beam to the SW Tank Pt-C @ approx. 15m. Access to the rear of the property is easy, via two options.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Brady and Jackie carried out quite extensive drainage works involving careful digging by hand and precision trench work using their digger. We are very pleased with them, easy to communicate with, flexible happy to make slight alterations as the job evolved. They left our drive tidy and clean each day and went over and above duty digging a difficult pile hole involving hefty tree roots. They work together very well and we would certainly have them back in the future.
Work carried out by the owner/operator
Reviewed on 24-04-2024
#1 | Tradie 1 |
|
11 jobs | Secured job |
#2 | Tradie 2 |
|
9 jobs | No longer in contact |
#3 | Tradie 3 |
|
7 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
#5 | Tradie 5 |
|
1 job | No longer in contact |
#6 | Tradie 6 |
|
2 jobs | No longer in contact |
#7 | Tradie 7 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work