We are the plumbers on this job and the engineer is saying that the existing manhole onsite needs to be upgraded and an inspection chamber added as per drawings. The pump station installed for the bathroom will also have to be changed so that the outlet discharges directly into the chamber. Can meet you on-site to look over works. Below is the current layout of area and detail of new chamber that’s needed
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 |
|
0 jobs | No longer in contact |
#4 | Tradie 4 |
|
4 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 |
|
1 job | No longer in contact |
#7 | Tradie 7 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work