Review

Lower the stormwater soakhole cover by 90mm

Job image

Job description

Drain Repair & Inspection
Auckland

Previous landscaper insisted the drainlayer lifts the lid for the landscaping he was proposing. Unfortunately he couldn't deliver, and I found another landscaper who knows what he is doing. However, it turns out that lifting the soakhole lid was a mistake as it was fine as it was installed originally. So, I need a drainlayer to drop the height of the soakhole cover by 90mm, which is the top of the piece of framing you can see next to it. It's a simple job as you won't need to cut the chamber etc. All it needs to be done is to break the concrete holding the lid, and re-set it at the right height by new concrete on top of the concrete soakhole chamber.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Andrew was in touch quickly, came to see he job on time and provided the quote in timely manner. He came on the day he said he would, and finished the job as agreed. I'lldefinitely use him again for drainage jobs in the future.

Work carried out by the owner/operator
Reviewed on 15-02-2024

Tradesperson reply
"Great customer paid me the following day after I completed the job , easy to deal with, would definitely do work for this home owner again."