Removal of waste from a bathroom Reno. Gib, wood, old bath, old vanity, old shower, cardboard etc. Including heavy concrete shower base, 1m by 1m x 0.25m. 3 people would be needed to lift if not broken up into smaller sections. Some waste including concrete Located on top of steps as in picture. A little more waste now than in picture say 10 to 15%. Can quote for all waste except concrete block also. Flexible in timeframes.
Partner with Builderscrack
Get work