Two bathrooms floor and walls. One has a tile shower,the other is plastic Base and liner. The kitchen and pantry area to be tiled, floor and walls. We have all of the tiles. Tiling will be complete before we fit the kitchen. Floor is concrete.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
3.0
|
Great team. A few technical issues were experienced and Lucas was able to provide solutions. We are very pleased with the result.