Active job

Tiles, plaster and other

Job description

Floor and Wall Tiling
Wellington

We plan to install a gas central system downstairs house and need to prepare the place for it : remove mud floor (1 or 2 cubic meter), tiles (approx. 20 m²), build 'on 2 walls and installing 2 doors, opening one other wall to create a direct access in the house from the garden; insulation and (rustic) ceiling on the same surface.


Trade professionals

#1 Tradie 1 No recent reviews 10 jobs No longer in contact
#2 Tradie 2 No recent reviews 9 jobs No longer in contact
#3 Tradie 3 No recent reviews 3 jobs No longer in contact
#4 Tradie 4 No recent reviews 9 jobs No longer in contact
#5 Tradie 5 No recent reviews 1 job No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo