Tiling around bath: the end, the side, a small part of wall and a shelf. Not a huge area but needs to be done as soon as possible (in the next week or two).
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 11-03-2015
Partner with Builderscrack
Get work