Active job

Lower bathroom unit 23/185 Tasman

Job image

Job description

Floor and Wall Tiling
Wellington

The existing pebble floor of the shower needs to be rebuilt with a levelling compound and then a waterproof seal, followed by tiles. A number of tiles on the wall of the shower also need to be taken off and replaced with matching tiles so as to properly maintain the water proofing. The existing shower floor is cracked and leaking into an adjacent wardrobe


Trade professionals

#1 Tradie 1
5 jobs No longer in contact
#2 Tradie 2
68 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo