Active job

Main and Ensuite Bathrooms

Job description

Floor and Wall Tiling
Wellington

Main Bathroom: - Prime floor and all walls ready for Tiling - Apply 2 coats of waterproofing membrane (Dampfix Gold) to floors, upstand 100mil, behind bath and vanity, Shower walls to 2.4M (over 2 consecutive days) -- Install under floor heating - Tile Floor and level entry to Shower slot drain using 600 x 600 tiles (1.8m x 4m) - Tile 2 walls using 600 x 600 tiles (2.4m x 4m) - Tile 1 wall using 600 x 600 tiles (1.8m x 2.4m - around doorway) - Tile feature wall using 300 x 300 sheets (1.8m x 2.4m) - Tile Recess with mitred corners - Grout tiled area - Silicon Ensuite: - Prime floor and all walls ready for Tiling - Apply 2 coats of waterproofing membrane (Dampfix Gold) to floors, upstand 100mil, behind vanity, Shower walls to 3M (over 2 consecutive days) -- Install under floor heating - Tile Floor and level entry to Shower slot drain using 200 x 200 tiles (1.2m x 3.6m) -- Tile feature wall using as 200 x 200 tiles (3m x 1.2m) - Tile 2 walls using 600 x 600 tiles (3m x 3.6m) - Tile 1 wall using 600 x 600 tiles (3m x 1.2m) - Tile Recess with mitred corners - Grout tiled area - Silicon All tiles have been purchased in advance. Timing: 3rd/4th week of July


Trade professionals

#1 Tradie 1
46 jobs Secured job
#2 Tradie 2
39 jobs No longer in contact
#3 Tradie 3
142 jobs No longer in contact
#4 Tradie 4
36 jobs No longer in contact
#5 Tradie 5
17 jobs No longer in contact
#6 Tradie 6
39 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo