Main Bathroom: - Prime floor and all walls ready for Tiling - Apply 2 coats of waterproofing membrane (Dampfix Gold) to floors, upstand 100mil, behind bath and vanity, Shower walls to 2.4M (over 2 consecutive days) -- Install under floor heating - Tile Floor and level entry to Shower slot drain using 600 x 600 tiles (1.8m x 4m) - Tile 2 walls using 600 x 600 tiles (2.4m x 4m) - Tile 1 wall using 600 x 600 tiles (1.8m x 2.4m - around doorway) - Tile feature wall using 300 x 300 sheets (1.8m x 2.4m) - Tile Recess with mitred corners - Grout tiled area - Silicon Ensuite: - Prime floor and all walls ready for Tiling - Apply 2 coats of waterproofing membrane (Dampfix Gold) to floors, upstand 100mil, behind vanity, Shower walls to 3M (over 2 consecutive days) -- Install under floor heating - Tile Floor and level entry to Shower slot drain using 200 x 200 tiles (1.2m x 3.6m) -- Tile feature wall using as 200 x 200 tiles (3m x 1.2m) - Tile 2 walls using 600 x 600 tiles (3m x 3.6m) - Tile 1 wall using 600 x 600 tiles (3m x 1.2m) - Tile Recess with mitred corners - Grout tiled area - Silicon All tiles have been purchased in advance. Timing: 3rd/4th week of July
#1 | Tradie 1 |
|
46 jobs | Secured job |
#2 | Tradie 2 |
|
39 jobs | No longer in contact |
#3 | Tradie 3 |
|
142 jobs | No longer in contact |
#4 | Tradie 4 |
|
36 jobs | No longer in contact |
#5 | Tradie 5 |
|
17 jobs | No longer in contact |
#6 | Tradie 6 |
|
39 jobs | No longer in contact |
Partner with Builderscrack
Get work