We have a new kitchen and want a tiler to do our splash back. This would be a very quick job for a qualified tiler as we have all the materials needed and would take 1 half day only. It is . job I was going to do myself but have recently been diagnosed with cancer and told Im not allowed.
Workmanship |
4.0
|
Cost |
3.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 16-05-2019
Partner with Builderscrack
Get work