Bathroom remodel. Need: 1. Floor levelling applied 2. Underfloor heating installed 3. Waterproofing --- floor tiles laid 5. Floor tiles laid over a profinish tile tray system (mitre the edges) 6. Subway tiles laid in 2 walls of shower Looking at being ready tile by 13 feb. Thanks
Partner with Builderscrack
Get work