I have 2 bathrooms. One needs some resealing/a small amount of grouting done and tidied up and the other needs the same but also 2 small tiles placed at the back of a toilet wall to finish off the connection from the other tiles. This was originally skipped while the new toilet was getting installed.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 31-12-2023
Partner with Builderscrack
Get work