Published on 21 August 2009
Kitchen walls/splashback to be tiled first, I will have removed wallpaper from the jib so whatever prep prior to tiling needs to be done , small wall area between bench and window sill needs straightened out as there is a dip in it. If I am satisfied with the kitchen wall tiling job done there is the floor tiling job: Approx 35 M2 maybe slightly less, I have tiles already (40 M2) , ceramic I think, going over particle board so need cement board laid first, I dont have this, tiler to supply and install fixing any imperfections in particle board first. Area of Lounge/Kitchen/Dining is a Square with a small ceiling to floor wall dividing the Lounge - Kitchen. Job to suit someone that can do whole job preferably, or just let me know what parts need to be done by a builder or plasterer. Free Quotes Only thanks Full wall skimming job also available in these areas , cheers
Partner with Builderscrack
Get work