Published on 5 July 2012
Need to take out old bathroom including stripping tiles of floor and 2/3 way up wall. Removing all fittings including bath, vanity, toilet, and then plumbing in new. Retiling floors and walls. Can quote be separate for removing all tiling. May also require larger hot water cylinder to be installed.
Partner with Builderscrack
Get work