Bathroom and kitchen tiling required to a property under renovation. Bathroom: surround of bath and across length of vanity. Kitchen: surround of cooktop/hob area. The separate toilet room also needs some attention to the existing tile work. Ideally we will require a result with in two weeks.
#1 | Tradie 1 | No recent reviews | 18 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 7 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 18 jobs | No longer in contact |
Partner with Builderscrack
Get work