Published on 2 February 2025
I have a new stone benchtop that doesn't meet my existing wall tiles by about 11.5mm. Leaving a gap. Length of gap is 4.3m. I'm hoping to fix the gap by using an edge trim or some sort of capping. I don't want to silicone it. Interested to discuss solutions if anyone has any. Thanks Kerry
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Tom did a very nice job and was organised, clean and tidy. Revommended.
Work carried out by the owner/operator
Reviewed on 6 February 2025
Tradesperson reply
"Thank you very much for the review. I really appreciate it
Tom Tiler"
Partner with Builderscrack
Get work