Tiling behind new 1200 vanity. The old tiles were removed behind the old pedestal basin so the tongue & groove paneling has been damaged where they were. Photos show the tile I am considering using. The mirror in the photos is only temporary and will be replaced by a new one after tiling. Will also need the laundry tiled between the top and bottom cabinets once they are installed.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Mateus did a fantastic job and was great with comms. Using him again for a bigger job
Work carried out by the owner/operator
Reviewed on 23-12-2023
Tradesperson reply
"Really Thank you Anna for your trust in my work, I am always looking to do the best for my client. It will be a pleasure to assist you in future work."
#1 | Tradie 1 |
|
2 jobs | Secured job |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
Partner with Builderscrack
Get work