Please note: We have purchased all of the following items, ready to install 1, Remove existing drop in shower and replace with new larger drop in shower and liner, --- - remove old shower head & waste and replace with new ones. (No tiling needed in the shower. 2. Replace old toilet with new back to wall S trap toilet. 3. Replace old hung vanity with new hung vanity and new hung mirror cabinet. 4. Tile floor and walls. Tiles also purchased and ready to use. 5. Replace existing heated towel rail with new one. (using same power socket) Plumbing: The New Shower, toilet and vanity are in the same position as the existing plumbing inlets/outlets.
#1 | Tradie 1 |
|
201 jobs | No longer in contact |
#2 | Tradie 2 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work