We need our bathroom shower box and floor tiled. All preparation work has been done and we have the tiles.
Workmanship |
2.0
|
Cost |
1.0
|
Schedule |
1.0
|
Communications |
2.0
|
Zane the principal of the firm and tradesman started out with a hiss and a roar. He answered my request immediately, gave a price estimate and started the next day. From then on it went downhill. There were numerous failures to turn up on time if at all, constant requests for progress payments and failure to keep to the work schedule. His tiling skills when here seemed to be satisfactory. He was totally unreliable and I would not recommend him.
Work carried out by the owner/operator
Reviewed on 01-07-2016