I am planning a complete remodel of two bathrooms. One, a shower room and separate toilet at the moment to be a combined bathroom toilet and one bathroom and separate toilet to be a wet room shower/ toilet. Some re-positioning of water pipes will be required. There will be some gibbing and tiling (wall and floor) involved but any electrical work will be handled by ourselves so no electricians will be required.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 |
|
32 jobs | No longer in contact |
Partner with Builderscrack
Get work