The builders tiler can not start when needed. There are two bathroom floors, a walk in shower, under floor heating. Also there is a small area of the kitchen floor and walk in pantry to be tiled. The tiles have already been pur hated. The job needs to be done without delay and needs to be started on August 22nd.
#1 | Tradie 1 |
|
13 jobs | No longer in contact |
#2 | Tradie 2 |
|
22 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
30 jobs | No longer in contact |
#5 | Tradie 5 |
|
257 jobs | No longer in contact |
#6 | Tradie 6 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work