Basically job is to replace existing old shower (900mm square base) with new one. Shower consists of two walls (which will need to be tiled) and two glass panels. I have sourced the new shower base and glass sides and also taps etc. I will also remove existing shower wall panels and side glass panels (excluding base). Job will entail - Remove existing shower base (I will dispose of it) - Possibly some water pipe work to redirect main water outlet from existing high level, to waist level (so as to connect to hose) - Make good and re-tile 2 * side walls (floor to celing) with supplied tiles - Grout tiles - Install new shower base and glass sides - Install new shower water controller and slide rail - Ensure shower is water tight and there are no leaks. Plus tap mixer works correctly. - Fit new tap to sink (replacement of similar tap) - tap will be supplied - Replace existing separate old bath taps with new modern mixer tap. - Wish to get work completed in next two weeks
#1 | Tradie 1 |
|
211 jobs | No longer in contact |
#2 | Tradie 2 |
|
13 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 3 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work