Active job

Brand new bathrooms need waterproofing/tiling

Job image
Job image
Job image
Job image
Job image

Job description

Floor and Wall Tiling
Rodney

We have a new build in Whangaparaoa and will require a tiler/waterproofer to be available in 2-3 weeks. *This timeframe is very important* There will be three rooms involved, an ensuite, bathroom and powder room. Ensuite: Floor tiling, 3x full walls including a walk-in shower and recess. Waterproofing required. Room is standard 2.4 stud with a floor area of 5.6m2 Bathroom: 3x full walls and side of bath. Waterproofing required. Room is standard 2.4 stud with a floor area of 4.95m2 Powder room: 1x full wall. Room is standard 2.4 stud height and the singular wall being tiled is 1.095m wide. Plan details are available upon request. Tiles have already been purchased.


Trade professionals

#1 Tradie 1 No recent reviews 0 jobs No longer in contact
#2 Tradie 2 No recent reviews 9 jobs No longer in contact
#3 Tradie 3
112 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo