We have a new build in Whangaparaoa and will require a tiler/waterproofer to be available in 2-3 weeks. *This timeframe is very important* There will be three rooms involved, an ensuite, bathroom and powder room. Ensuite: Floor tiling, 3x full walls including a walk-in shower and recess. Waterproofing required. Room is standard 2.4 stud with a floor area of 5.6m2 Bathroom: 3x full walls and side of bath. Waterproofing required. Room is standard 2.4 stud with a floor area of 4.95m2 Powder room: 1x full wall. Room is standard 2.4 stud height and the singular wall being tiled is 1.095m wide. Plan details are available upon request. Tiles have already been purchased.
#1 | Tradie 1 | No recent reviews | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 9 jobs | No longer in contact |
#3 | Tradie 3 |
|
112 jobs | No longer in contact |
Partner with Builderscrack
Get work