Require floor tiling of small bathroom approx ~ 2.4 m² in Porirua, ideally late July 2022. Bathroom is in an older 1950s house, so current flooring is native timber. We will remove toilet, vanity, and door prior to tiling, to be replaced in the same spot.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 13-10-2023
Partner with Builderscrack
Get work