Active job

A bridge to far....Bathroom floor

Job image
Job image
Job image

Job description

Floor and Wall Tiling
Papakura

Need to redo bathroom floor as tiles failed to stick and I have just run out of steam/time. 4.3 square meters. Water proffing will need to be repaired. 1. Remove the thinset. 2. Repair waterproofing. 3. Relay tiles/grout and seal. We have the tiles, grout mix and sealant. But will need new thinset mortar. I will remove all the tiles and remove most of the thinsetmotar that I can.


Trade professionals

#1 Tradie 1
180 jobs No longer in contact
#2 Tradie 2
59 jobs No longer in contact
#3 Tradie 3
148 jobs No longer in contact
#4 Tradie 4
157 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo