Floor area is 4m2, floor is 17m2 in total. Side of tub is .77m2. Will be using --- on floor and --- on wall and side of tub. Will have all trimming removed, underlay put down and toilet and vanity removed. Will waterproof as well. Wrapping around 2 windows. The vanity and toilet will be removed. Shower will stay and tiling go around the shower base. Underlays will be prepared by me and I will also waterproof as well. Only need to come do the tiling. Tile for wall will be --- and floor will be --- . I only have a budget of $1000 and need it done anytime next week. Please only approach if you can do within my budget or very close to it. Need it done anytime next week. Thank you
#1 | Tradie 1 |
|
180 jobs | No longer in contact |
#2 | Tradie 2 |
|
59 jobs | No longer in contact |
#3 | Tradie 3 |
|
35 jobs | No longer in contact |
Partner with Builderscrack
Get work