A bathroom renovation project requires a skilled tiler who can start immediately. The tiler will be responsible for laying tiles on a 3m2 floor, 10m2 shower area, and 4m trim. The shower area also needs waterproofing with a brush applied rubberized membrane. The homeowner will provide the tiles and the adhesive for the shower floor
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 |
|
36 jobs | No longer in contact |
#3 | Tradie 3 |
|
22 jobs | No longer in contact |
#4 | Tradie 4 |
|
30 jobs | No longer in contact |
#5 | Tradie 5 |
|
0 jobs | No longer in contact |
#6 | Tradie 6 |
|
2 jobs | No longer in contact |
#7 | Tradie 7 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work