Ttiling of a 3 side shower, the bathroom floor and 1.2m high on rest of the walls. GIB will be ready, also need waterproofing done.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 15-05-2023
Partner with Builderscrack
Get work