A tiler is required to mix and apply a 2-part water-based waterproofing material (Ardex WPM300) in 2 coats as per the guidelines, after preparing the concrete slab surface and fixing bond-breaker tape all around the room. Once the membrane is cured (1-2 days), tiling to start with --- tiles, level surface (no slope required). The floor area is 15.7 sq.m. Grouting used to match the tiles colour. Silicone sealant all around the perimeter. The room is ready for tiling works. The work needs to start in one week or even earlier if possible.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent workmanship. Clear and fast communication. Very happy with the result.
Work carried out by the owner/operator
Reviewed on 16-05-2023
Tradesperson reply
"Thank you very much Sir"