Review

Room tiling

Job image

Job description

Floor and Wall Tiling
North Shore

A tiler is required to mix and apply a 2-part water-based waterproofing material (Ardex WPM300) in 2 coats as per the guidelines, after preparing the concrete slab surface and fixing bond-breaker tape all around the room. Once the membrane is cured (1-2 days), tiling to start with --- tiles, level surface (no slope required). The floor area is 15.7 sq.m. Grouting used to match the tiles colour. Silicone sealant all around the perimeter. The room is ready for tiling works. The work needs to start in one week or even earlier if possible.


Review

Workmanship
5.0
Cost
4.0
Schedule
5.0
Communications
5.0

Excellent workmanship. Clear and fast communication. Very happy with the result.

Work carried out by the owner/operator
Reviewed on 16-05-2023

Tradesperson reply
"Thank you very much Sir"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo