Active job

Tiling on bathroom wall

Job image
Job image
Job image

Job description

Floor and Wall Tiling
North Shore

Plumber has installed a new mixer on bathroom wall. Now the same colour tiles need to be replaced on the wall around the mixer. Minimum 3 new tiles needed, up to a maximum of 6 needed. 1. Remove mixer handle and faceplate (with screwdriver/allen key). 2. Replace tiles. 3. Replace mixer handle and faceplate (with screwdriver/allen key). Ideally this job will be completed by February 27.


Trade professionals

#1 Tradie 1
39 jobs No longer in contact
#2 Tradie 2
180 jobs No longer in contact
#3 Tradie 3
5 jobs No longer in contact
#4 Tradie 4
59 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo