Our Plumber will install a new toilet. However, we need a Tiler to remove and swap around 2 tiles behind the cistern. When the toilet has been installed, the Tiler has to come back and put back the two tiles. We have an extra tile in case of breakage/chip. We expect the job to be done within March. This has to be coordinated with our Plumber.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Amin is easy to deal with. He is honest and reliable.
Work carried out by the owner/operator
Reviewed on 24-03-2023
Partner with Builderscrack
Get work