I have replaced the vanity unit and toilet. The plumber estimates maybe a day and a half work. The job is ready to go now. In the photos where the black glue dots are( I have removed) a wall hung mirror cabinet is going. Also a small area around toilet wall.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
An absolute pleasure to have Alex in my home. Superb tradesman passionate about his craft. Great to have found a tradesman that doesn’t slap everything in the too hard basket.
Work carried out by the owner/operator
Reviewed on 07-12-2021
Partner with Builderscrack
Get work