Job: We are completing the bathroom for a minor unit. We would like to tile the floor and walls, and tile + waterproof the built-in shower. Coverage is approx. 15 - 20sqm. We will provide the tiles. Can start as soon as Thursday 23rd May. The shower tray needs to be fully waterproofed to ensure we pass the council tanking inspection (we would like the entire shower waterproofed as well). Dimensions: Entire bathroom footprint is 2100 x 2980. Internal shower footprint is 990 x 990. Shower height is 2070 on the low side, and 2540 on the high side (sloped ceiling). Tile the walls up to 1200mm, and tile + waterproof the entire shower. Tiles: Floor tiles are 400 x 400. Wall tiles are 450 x 450. Timeframe: Our goal is to start on this right away, to have it done mid next week (to finish around 28th or 29th May). We will be painting walls tomorrow (23rd May).
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
We really enjoyed working with NZ Tiling Specialists and appreciated them working with us on a tight schedule and changes that came in during the project. Overall we are very satisfied with the work, though we did plan it out carefully to ensure nothing got missed.
Reviewed on 20-07-2019
Tradesperson reply
"Do it right the first time"
Partner with Builderscrack
Get work