Hi I need my shower Tiled and the floor ( Wet floor) I would like to do it in two halves as I need to keep the bathroom functional, I will supply the tiles will need the water proofing done as well the shower part is about 15sm and the rest will be about 30sm thanks
#1 | Tradie 1 |
|
30 jobs | No longer in contact |
#2 | Tradie 2 |
|
142 jobs | No longer in contact |
Partner with Builderscrack
Get work