We require a tiler for our ensuite. Floor and walls to be water-proofed and tiled including a level entry shower. The area will be ready for tiling in approx 2 weeks. Will require an inspection of the area and give a quotation.
#1 | Tradie 1 |
|
46 jobs | No longer in contact |
#2 | Tradie 2 |
|
39 jobs | No longer in contact |
#3 | Tradie 3 |
|
16 jobs | No longer in contact |
#4 | Tradie 4 |
|
39 jobs | No longer in contact |
#5 | Tradie 5 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work