We have refurbished our sleepout and have a bathroom floor which needs tiling. The tile and slate is down and we have the tiles. The floor area is 4m square with shower tray in the corner.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Hayden did a great job! Communicated well, turned up when he said and kept me updated throughout- thanks!
Work carried out by the owner/operator
Reviewed on 02-02-2022
Partner with Builderscrack
Get work