Kitchen bench top is being replaced. Tiles are a plain white square so hopefully an easy match. Work required for 21 / 22 Feb or soon after to co-inside with bench being fitted. Blacked area is where new bench rolls up to continue along as for the right side of bench. Couple of broken tiles to replace with new tiles added as highlighted in green. Maybe regrouting to existing tiles.
#1 | Tradie 1 |
|
46 jobs | No longer in contact |
Partner with Builderscrack
Get work