We require a Tiler to tile the floor, shower tray and halfway up the wall We are starting the job on the 18th February and tiling should be around the end of that week or following week
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
We found Ebi to be great to deal with, and the shower looks great. Would use him again and recommend him and his team to anyone.
Work carried out by the owner/operator
Reviewed on 13-05-2019
Partner with Builderscrack
Get work