Published on 22 April 2023
We need 4 tiles replaced in bathroom above vanity and 1 tile replaced in front entrance floor. We have the tiles. We need this done between May 3 - May 20
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
It was a pleasure to work with Chris, from first contact onwards.
Work carried out by the owner/operator
Reviewed on 17 May 2023
Partner with Builderscrack
Get work