Tiles to be put into the bathroom on the floor and up 3 walls.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 17-09-2013
Partner with Builderscrack
Get work