Replace 2x floor tiles and one wall tile on side of bath. Bath tile has fibrelite board behind it, floor tiles are onto concrete slab. I have spare tiles on site. Access can be arranged at any time of day.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Completed the job at the agreed price. Arrived exactly whe he said he would. Great communication.
Work carried out by the owner/operator
Reviewed on 12-02-2018
Partner with Builderscrack
Get work