We installed a new kitchen a couple of years ago and still need some of the finishing touches completed. We would like subway tiles underneath our rangehood go right around the kitchen walls (in line with rangehood). We would also like some shelving (wooden shelving if possible) to work in with the tiles. The framing around our kitchen window needs tidying up as well. Some plastering required. Also plastering possibly required by the kitchen sink (unless can be covered by tiles). Light switches also need replacing and tidying up.
#1 | Tradie 1 |
|
157 jobs | Secured job |
#2 | Tradie 2 |
|
180 jobs | No longer in contact |
#3 | Tradie 3 |
|
59 jobs | No longer in contact |
Partner with Builderscrack
Get work