Published on 20 July 2022
I have a small 1.3m2 floor tiling job to be done in a bathroom where a bath has been replaced with a shower. The new tiling will butt up to the existing floor tiles. I will supply the tiles but the tiler shall supply all other materials. The floor should be ready to tile in approx 2 weeks.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Chris was flexible and cooperative and did an excellent job
Work carried out by the owner/operator
Reviewed on 30 August 2022
Partner with Builderscrack