repair missing grout om floor and clean, remove floor grate and regrout and seal must be done while tenant away from 30th December - 7th January
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Leo arrived on time during holiday period and completed with the time brief.
Work carried out by the owner/operator
Reviewed on 09-01-2021
#1 | Tradie 1 |
|
347 jobs | Secured job |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
18 jobs | No longer in contact |
#4 | Tradie 4 |
|
18 jobs | No longer in contact |
#5 | Tradie 5 |
|
180 jobs | No longer in contact |
#6 | Tradie 6 |
|
42 jobs | No longer in contact |
Partner with Builderscrack
Get work