Published on 31 October 2024
A tile had to be taken up and cement board cut out in order to access a pipe that was blocked. Need the gap re-tiled
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Did a great job, great communication, transparent and flexible. They went and got the tile for us and matched it as close as possible to the current one. Cut it down to fit etc Overall great experience and highly recommend.
Work carried out by a subcontractor
Reviewed on 23 January 2025
Partner with Builderscrack
Get work