Published on 15 August 2024
lift the decking boards around the pool. Remove existing liner, remove the steel wall of the pool, remove the dirt behind the wall. Install a new wall, reinstate the pool floor and install a new liner. Backfill the pool with a cement-stabilised backfill. Re-install the deck.
Partner with Builderscrack
Get work