Published: 15 August 2024
lift the decking boards around the pool. Remove existing liner, remove the steel wall of the pool, remove the dirt behind the wall. Install a new wall, reinstate the pool floor and install a new liner. Backfill the pool with a cement-stabilised backfill. Re-install the deck.
#1 | Tradie 1 |
|
1 job | In contact |
#2 | Tradie 2 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work