I want to install a 7.5m para pool inside my old 9m pool. I want it finished by next summer. The pool side supports can be supported by old supports so do not have to dig out to concrete, but needs about 1 cubic metre of concrete each side to brace the 3 side posts against the old ones. I need someone who has done at least one of these before. The sand from the old pool can be used for new one. Once finished I may need someone to remove old pool but that can be a different job
Partner with Builderscrack
Get work