Published on 26 January 2024
The existing coping tiles are going to be removed. Would need you to come down and grind and prepare the tiling surfaces while the old liner is in the pool, so that once the new liner goes in the job is mostly cutting and laying the tiles. The pool is oval 11.5 m long and 4.5m wide. I have chosen the tile I am going to use already. Would prefer an estimate of time and pay an hourly rate for the job. Not really looking for a fixed quote.
Partner with Builderscrack
Get work